Refurbishment National Stadium Karachi





First time ever in Pakistan Bismillah Group of Companies are going to Installed Tensile Fabric Membrane at National Stadium Karachi with International Consultant for Assistance. The project started 2017 and included Refurbishment of all enclosure roof with the additional steel structure approx. 400 tons and construction of a large innovative roof Tensile Membrane that Cover of the Stadium. We have done dismantling the existing roofing system of steel trusses and after construction of additional tiers re-installation of the roof trusses. We can use Epoxy Paint all the Truss before install Tensile Membrane. The National stadium is first sporting venue in the Pakistan to have roofs made of tensile membrane. The Membrane Roof are fireproof and water proof it can last up to 25 years.
Specialist Areas of Operation

  • Dismantling the existing roofing system
  • Additional Steel Fabrication
  • Modular Construction
  • Epoxy Paint
  • Installed Tensile Memrane
  • Specialist Finishing

Back to Top